Sierra Army Depot - Buildings 356 & 360

Location: Herlong, CA
Contract Awarded: August, 2019
Project Duration: 2 months
Project Value: $685,000
Project Description: Thomas Joseph Solutions, Inc. was a subcontractor on this government job which took less than two months to complete. 100,000 square foot resinous flooring installation. Existing concrete preparation and profiling. Expansion and control joint cleaning and cut out. Epoxy control joint installation and filler. Quarter inch epoxy overlay on entire surface.